$\text{P}2||\text{C}_\text{max}$

The $\text{P}2||\text{C}_\text{max}$ problem is one of the most popular scheduling problems known. There exist plenty of different algorithms and approaches to solving it or approximating an exact solution, as the problem itself is strongly NP-hard. Scheduling.jl provides a few approximation algorithms for the $\text{P}2||\text{C}_\text{max}$ problem.

P2__Cmax_SW1(J::Vector{Job}, M::Vector{Machine}; eps = 1//10)

This is a (1 + eps)-approximation algorithm for the P2||Cmax problem.

References

  • Schuurman, P., & Woeginger, G. J. (2001), Approximation schemes-a tutorial. Lectures on Scheduling.
source
P2__Cmax_SW3(J::Vector{Job}, M::Vector{Machine}; eps = 1//10)

This is an FPTAS algorithm for the P2||Cmax problem.

References

  • Schuurman, P., & Woeginger, G. J. (2001), Approximation schemes-a tutorial. Lectures on Scheduling.